Composite Bridge over the C-31

Composite bridge of steel box girder whose depth varies parabolically from 3.40 metres on reinforced concrete piers to 1.70 m at the centre of the main span. The construction of the deck girder is made
without necessity of supports in formwork. The viaduct is constructed resting on deep foundation by pile caps.

Location: Palamós, Girona
Total Length: 199.1 m
Main Span: 68.1 m
Deck Width: 10.0 m

Gallery

Related Projects