Composite Bridge over the N-33

Straight composite bridge of constant 1.67 m deep steel box girder. The deck girder works as a cantilever by transverse metal ribs and reinforced concrete top slab. During its construction, the deck stands
by itself without necessity of supports in formwork. The structure is built up in a high seismic area.

Location: Torrevieja, Alicante
Total Length: 64.0 m
Main Span: 36.0 m
Deck Width: 12.0 m

Gallery

Related Projects