Metropolitan South Bypass — Phase I

Curved composite bridge of constant 1.40 m deep steel box girder. The deck girder rests on 22.5 m high reinforced concrete piers. During its construction, the deck girder stands by itself without necessity
of supports in formwork. The viaduct is constructed resting on deep foundation by pile caps.

Location: Bilbao, Vizcaya
Total Length: 144.0 m
Main Span: 32.0 m
Deck Width: 8.75–9.30 m

Gallery

Related Projects