Composite Footbridge over AS-17 Road

Steel box curved composite footbridge consisting of 4 spans of 35.50+41.72+41.72+41.72+35.50 m,
with a total length of 154.54 metres. Deck results fully integrated with main piers through
specific transfer boxes. The frame footbridge has variable depth deck between 1.20 metres along
spans and 1.66 metres over head piers. Deck platform width is fixed at 3.60 metres.

Location: Siero, Asturias
Total Length: 154.54 m
Main Span: 41.72 m
Deck Width: 3.60 m
4 spans

Gallery

Related Projects