Composite Bridges — Bobes Industrial Area

Twin decks viaduct over the main area roundabout. The bottom concrete slabs over piers are outside
the steel box girder, allowing regular deck depth. During its construction, the deck girder stands
by itself without supports.

Location: Siero, Asturias
Total Length: 139.0 m
Main Span: 38.60 m
Deck Width: 12.14 m

Related Projects