Composite Bridge over A-66a — HUCA

321.675 m long curved composite bridge over the A-66a to connect the new Hospital of Asturias with
the main motorway which links Oviedo and Gijón. The depth of its steel box girder varies
parabolically. During its construction, the deck girder stands by itself without necessity of
supports in formwork.

Location: Oviedo, Asturias
Total Length: 321.675 m
Main Span: 64.0 m
Deck Width: 8.64 m

Related Projects